Hoisting and rigging manual






















The U.S. Department of Energy (DOE) Hoisting and Rigging Standard is intended as a reference document to be used by supervisors, line managers, safety personnel, equipment operators, and any other personnel responsible for safety of hoisting and rigging operations at DOE sites.  · The Crosby Group, Inc., has granted permission to use information about wire rope clips and illustrations of swivel hoist rings and rigging techniques from The Crosby General Catalog. For questions or comments, please send email to Patrick Vallejos. Hoisting Rigging Manual. Approved Ballots. ESH Manual Chapter Hoisting and Rigging The purpose of this program is to ensure that hoisting and rigging equipment is safe to operate and that lifts are performed safely.


attached using a rigging system. There will definitely be a couple questions on the PE exam about lifting and rigging so make sure to do multiple practice questions. For further detailed information download the Hoisting and Rigging Fundamentals, BEST RIGGING PRACTICES IN LIFTING OPERATIONS. PNNL Hoisting and Rigging Manual. Technical Report Haynie, Todd; Fullmer, Michael. This manual describes the safe and cost effective operation, inspection, maintenance, and repair requirements for cranes, hoists, fork trucks, slings, rigging hardware, and hoisting equipment. It is intended to be a user's guide to requirements, codes, laws. The Office of Worker Safety and Health Policy (AU) has the responsibility for developing and maintaining the DOE Hoisting and Rigging Standard, DOE-STD, consolidating comments to national consensus standards bodies addressing hoisting and rigging, and providing comments to OSHA on any proposed rulemaking activity involving hoisting and rigging.


The Crosby Group, Inc., has granted permission to use information about wire rope clips and illustrations of swivel hoist rings and rigging techniques from The Crosby General Catalog. For questions or comments, please send email to Patrick Vallejos. Hoisting Rigging Manual. Approved Ballots. This Manual is a rewrite of the original Hanford Hoisting and Rigging Manual (WHC-CM), issued in August for RL contractors. Similar to that original manual, this Manual was prepared with input from the Hanford HR Committee with representatives from various RL contractors and trade unions, with overview by RL. The content of the PNNL Hoisting and Rigging Manual was derived from the Hanford Site Hoisting and Rigging Manual (DOE-RL). Permission was given to the Hanford Site Hoisting and Rigging Committee to use and reproduce portions of standards and information from the following sources.

0コメント

  • 1000 / 1000